Scheme Amendment | 7 and 9-15 Quarry Street, Fremantle

Share Scheme Amendment | 7 and 9-15 Quarry Street, Fremantle on Facebook Share Scheme Amendment | 7 and 9-15 Quarry Street, Fremantle on Twitter Share Scheme Amendment | 7 and 9-15 Quarry Street, Fremantle on Linkedin Email Scheme Amendment | 7 and 9-15 Quarry Street, Fremantle link

Consultation on this topic has concluded. 

We have initiated a planning scheme amendment for the use and development of three lots on Quarry St, Fremantle.


The City of Fremantle is looking to dispose of three properties located at Lots 1, 2 and 8 Quarry Street, Fremantle (street numbers 7 and 9 – 15), and wishes to sell them as a combined site.

The sites have different zonings under the local planning scheme. Since 2018, the City has been exploring options on a potential scheme amendment to change this, so that all lots share a common zoning. This would allow them to be sold and redeveloped together in a coordinated way.

Currently, the lots are zoned a combination of low-density (R25) residential (Lot 8) and high-density (R-AC3) mixed-use (Lots 1 and 2). The table below outlines the current details of each lot:

Summary of lots subject to this scheme amendment
Lot
Street No.
Land Area (m2)
Current Zoning under Planning Scheme
Current Density (R-Code) under the Planning Scheme
Lot 2
7
582
Mixed-Use
R-AC3 (High Density)
Lot 1
7
895
Mixed-Use
R-AC3 (High Density)
Lot 8
9-15
2656
Residential
R25 (Low Density)
TOTAL
4133
-
-


What is proposed for the site?

At the Ordinary Meeting of Council held on 24 July 2019, a formal amendment to the planning scheme was initiated. This was subsequent to a 12 month period of preliminary engagement with the local community on a potential scheme amendment, which considered various future zoning options for the site.

The amendment proposes a zoning on the site of ‘Mixed Use’ with a residential density of R80 (i.e. medium density). This density is in between the current densities of the lots. In addition to the re-zoning, rules to control building design are proposed in the planning scheme text as well as a new local planning policy.

A summary of the key provisions proposed for this site as part of the new amendment is outlined in the following table. These have been prepared in response to the extensive community consultation that has been undertaken on the proposed amendment to-date. The map at the top of this page provides a visual guide to the information in the table below.

Planning Element
Proposed Provision under Scheme Amendment
Zoning
Mixed-Use – allows for both residential and commercial development on the site
Residential Density
R80 – medium density
Building Height
For buildings within 10m of the side boundaries – Maximum 6m wall height and Maximum 9m roof height (typically 2 storeys).
For the remainder of the site – Maximum 10m wall height and Maximum 12m roof height (typically 3 storeys).
Street Setbacks
For buildings within 10m of the side boundaries - Minimum 4m and maximum 10m
For the remainder of the site - Minimum 2m and maximum 4m
Boundary Setbacks
  • A portion of boundary wall permitted on the side/south-western boundary, as indicated in red on the map.
  • Buildings required to be set back from side boundaries in accordance with the R-Codes.
  • A minimum setback of 2m from the rear boundary adjacent to the park.
Solar Access
  • Maximum 25% of the adjoining single residential property to the south-west, measured at midday 21 June.
Other
Windows or balconies and open style fencing is required to face the park to provide surveillance.


How can I find out more?

Further information on the scheme amendment can be found in the Relevant Information section on the right-hand side of this page. This includes previous Council reports on the proposal, as well as the draft scheme text and local planning policy for the site.

In addition, a Community Information Session will be held on 27 November 2019, 5:00-6:30pm at the Fremantle Leisure Centre (Training Room), 10 Shuffery St, Fremantle. Drop in any time during this session to chat to members of the City’s Strategic Planning Department about the proposal.

You can use the contact details on this page to get in touch with the City's Strategic Planning Department with any other queries.


Share your thoughts on the proposal below before 5:00pm Wednesday 15 January 2020.

We have initiated a planning scheme amendment for the use and development of three lots on Quarry St, Fremantle.


The City of Fremantle is looking to dispose of three properties located at Lots 1, 2 and 8 Quarry Street, Fremantle (street numbers 7 and 9 – 15), and wishes to sell them as a combined site.

The sites have different zonings under the local planning scheme. Since 2018, the City has been exploring options on a potential scheme amendment to change this, so that all lots share a common zoning. This would allow them to be sold and redeveloped together in a coordinated way.

Currently, the lots are zoned a combination of low-density (R25) residential (Lot 8) and high-density (R-AC3) mixed-use (Lots 1 and 2). The table below outlines the current details of each lot:

Summary of lots subject to this scheme amendment
Lot
Street No.
Land Area (m2)
Current Zoning under Planning Scheme
Current Density (R-Code) under the Planning Scheme
Lot 2
7
582
Mixed-Use
R-AC3 (High Density)
Lot 1
7
895
Mixed-Use
R-AC3 (High Density)
Lot 8
9-15
2656
Residential
R25 (Low Density)
TOTAL
4133
-
-


What is proposed for the site?

At the Ordinary Meeting of Council held on 24 July 2019, a formal amendment to the planning scheme was initiated. This was subsequent to a 12 month period of preliminary engagement with the local community on a potential scheme amendment, which considered various future zoning options for the site.

The amendment proposes a zoning on the site of ‘Mixed Use’ with a residential density of R80 (i.e. medium density). This density is in between the current densities of the lots. In addition to the re-zoning, rules to control building design are proposed in the planning scheme text as well as a new local planning policy.

A summary of the key provisions proposed for this site as part of the new amendment is outlined in the following table. These have been prepared in response to the extensive community consultation that has been undertaken on the proposed amendment to-date. The map at the top of this page provides a visual guide to the information in the table below.

Planning Element
Proposed Provision under Scheme Amendment
Zoning
Mixed-Use – allows for both residential and commercial development on the site
Residential Density
R80 – medium density
Building Height
For buildings within 10m of the side boundaries – Maximum 6m wall height and Maximum 9m roof height (typically 2 storeys).
For the remainder of the site – Maximum 10m wall height and Maximum 12m roof height (typically 3 storeys).
Street Setbacks
For buildings within 10m of the side boundaries - Minimum 4m and maximum 10m
For the remainder of the site - Minimum 2m and maximum 4m
Boundary Setbacks
  • A portion of boundary wall permitted on the side/south-western boundary, as indicated in red on the map.
  • Buildings required to be set back from side boundaries in accordance with the R-Codes.
  • A minimum setback of 2m from the rear boundary adjacent to the park.
Solar Access
  • Maximum 25% of the adjoining single residential property to the south-west, measured at midday 21 June.
Other
Windows or balconies and open style fencing is required to face the park to provide surveillance.


How can I find out more?

Further information on the scheme amendment can be found in the Relevant Information section on the right-hand side of this page. This includes previous Council reports on the proposal, as well as the draft scheme text and local planning policy for the site.

In addition, a Community Information Session will be held on 27 November 2019, 5:00-6:30pm at the Fremantle Leisure Centre (Training Room), 10 Shuffery St, Fremantle. Drop in any time during this session to chat to members of the City’s Strategic Planning Department about the proposal.

You can use the contact details on this page to get in touch with the City's Strategic Planning Department with any other queries.


Share your thoughts on the proposal below before 5:00pm Wednesday 15 January 2020.

  • CLOSED: The public comment period has concluded.



    Consultation on this topic has concluded. 

    Share Make a Submission on Facebook Share Make a Submission on Twitter Share Make a Submission on Linkedin Email Make a Submission link