Amended Option 1 to be Presented

A proposal for amended option 1 will be presented at the Finance, Policy, Operations & Legislation Committee (FPOL) meeting on Wednesday 10 October 2018.

The agenda for the FPOL meeting is now available on the City of Fremantle website.

The FPOL meeting commences at 6.00pm at the North Fremantle Community Hall, 2 Thompson Road, North Fremantle.

The concept for Option 1 can be viewed here, it includes:

  • Move the guarded school pedestrian crossing approximately 50 meters south of its current location and create a new guarded school pedestrian crossing, complete with median island refuge and also pedestrian crossing lights that will flash at peak, before and after school crossing times.

  • Remove the existing guarded school pedestrian crossing.

  • Move the existing northbound bus stop approximately 20m north of its existing location, to provide a safe distance from the guarded school pedestrian crossing.

  • Reinstate access for vehicles turning right into Scott Street through the removal of the trial median installed in March 2017.

  • Trial the use of a riley kerb system (rumble device) to deter vehicle lane changes on the approach to the guarded school pedestrian crossing.


Share Amended Option 1 to be Presented on Facebook Share Amended Option 1 to be Presented on Twitter Share Amended Option 1 to be Presented on Linkedin Email Amended Option 1 to be Presented link

Consultation has concluded

<span class="translation_missing" title="translation missing: en.projects.blog_posts.show.load_comment_text">Load Comment Text</span>