Amended Plans Received on 5 September 2022

The City received amended development plans on 5 September 2022, outlined as follows:

Amended Development Description:

20-STOREY MIXED-USE DEVELOPMENT, COMPRISING THREE (3) RESIDENTIAL APARTMENT TOWERS (198 MULTIPLE DWELLINGS) AND VARIOUS NON-RESIDENTIAL USES (RESTAURANT, SHOP, TAVERN, OFFICE, RECEPTION CENTRE AND INDUSTRY-LIGHT)

Summary of revisions to plans:

  • Increasing the Coventry Parade street setback of the podium levels of Tower 2 to the north by 10m (from 5.4m to 15.4m) and reducing the height of the 5-storey (23.8m above ground level) portion of this tower to 3-storeys (18.4m above ground level).
  • The provision of a proposed roundabout at the intersection of Coventry Parade and Thompson Road to manage traffic movements, with additional parking proposed within the future area of public open space (which may be removed prior to the construction of Stage 2 subject to City of Fremantle’s design intention for the open space).
  • Increasing the eastern side setback of the now 3-storey portion of Tower 2 from 35m to 40m.
  • Reducing the height of Tower 3 from 10 storeys (40.6m above ground level) to 6 storeys plus roof amenities (30.4m above ground level).
  • Reduction in overall dwelling number from 207 dwellings to 198 dwellings.
  • Provision of 27 car parking bays for exclusive use of residential visitors.
  • Increase in height of Tower 1 from 16 storeys (64.5m above ground level) to 20 storeys (77m above ground level).
  • Increase in height of 11-storey (49.3m above ground level) portion of Tower 2 to 15 storeys (54.8m above ground level).

Reduction in the overall height of the alfresco pavilion addition (7m to 4.1m; 2.9m reduction) above the first floor level and introduction of a lower profile, lightweight roof structure

The amended plans can be found in the document library.

Share Amended Plans Received on 5 September 2022 on Facebook Share Amended Plans Received on 5 September 2022 on Twitter Share Amended Plans Received on 5 September 2022 on Linkedin Email Amended Plans Received on 5 September 2022 link

Consultation has concluded

<span class="translation_missing" title="translation missing: en.projects.blog_posts.show.load_comment_text">Load Comment Text</span>